Somebody wins every tender you never heard about. CEDA finds them, prices them from your own past jobs, and holds every licence the bid depends on.
By contractors.
For contractors.
Built by people who have filed the permits, chased the bond, and waited on the billing. Based and built in Australia, on the ground in the Philippines, and already in the hands of established Philippine firms.
You find out too late· You price it from memory· One expired paper ends it· Nobody knows where it stands
One minute forty-seven seconds. The permit, the tender, the estimate, the schedule, the crew and the money, in the order a real job throws them at you.
The same system carries a job from the bid notice through to the certificate of completion.
All of it built around Philippine agencies specifically. Not a generic tracker with a compliance tab bolted on.
A job does not restart when it moves from the estimate to the site. Each stage reads what the one before it produced.
Contract terms, notice to proceed, permits, bonds and CAR insurance, all against a readiness gate that tells you what is still blocking you rather than what is merely expiring.
Gate Ready to signA bill of quantities drafted from your own past unit costs, and a PERT-CPM schedule built from the same lines. Delivery, equipment, manpower and procurement all hang off it.
Gate Ready to apply for the permitProject engineer, site engineer, quantity surveyor, liaison officer and accountant, each with their own view of one live job. Variation orders, weather, QC and labour compliance all logged against it.
Gate Ready to start constructionAccomplishment against the S-curve, billed against disbursed, cost by trade, and the physical progress you would otherwise only discover at handover.
Output Statement of Work AccomplishedPunch list, accounting audit, certificates of completion and acceptance, defects liability, retention release, as-built plans and the BIR closeout. The paperwork that ends a job, produced from the records that ran it.
Output Project closeout packA liaison officer at City Hall, a site engineer under a canopy, an owner on the way to a turnover. One project, one set of numbers, whichever screen is in front of you.
Fifteen your firm carries, thirteen that attach to a project. Eleven are critical: miss one and the bid does not count.
Every licence PCAB publishes, more than 18,000 of them, held on file rather than looked up one at a time. Alongside it a supplier directory that says who to call rather than what they charge, each firm carrying how far its details have actually been verified, and a warning on any merchant PhilGEPS has blacklisted.







help build a
better philippines
#NoToCorruption
#FloodControl
#BuildItRight
CEDA is built and running today, and every screen on this page is the working product rather than a mockup of one. The single exception is the five stage walkthrough, a simplified demo that labels itself as one: the live workspace carries a real project’s data, and a public page cannot. We are in closed beta and onboard firms individually, so that each one is set up against its own licences and its own project history rather than left to a signup form.
It drafts the scope and the quantities, then prices them from your own completed jobs and from suppliers publishing their own rates. It never invents a figure. A line it cannot source stays unpriced, prints as unpriced, and raises a warning before the estimate leaves your hands, because a bid carrying an invented number is worse than one carrying a blank. Where a supplier publishes no rate you see “Quote on request” rather than a zero, since a zero silently under prices the bid it sits in. Every line is yours to approve before it reaches the estimate.
We surface PhilGEPS civil works notices and match each one against your PCAB category and bracket, so the list you read is the work you can legally take rather than everything published. Each notice is gated on whether your firm is ready to bid, and where it is not, it names the specific document standing in the way instead of simply refusing. Preparing and submitting the bid remains yours.
No, and it is not built to. CEDA files nothing on your behalf. It tracks every credential you hold, flags what falls due and when, and sets out where to file and what will be asked for, so that nothing is lost in the handover between your office and the professional who files it. Your consultant does the same work against a clearer record.
Agencies, validity periods and renewal cycles are verified against official sources and are stable by nature, so they are held directly. Fees, form numbers and bond percentages are not: they change, and a stale figure presented confidently is worse than none at all. So we publish no figure we cannot stand behind and point you to the governing bidding documents or IRR for the current one.
Your records remain yours throughout. You can export the full compliance ledger and every stored document whenever you choose, during the subscription or on the way out. Leaving never locks you out of your own paperwork, because a licence history held hostage is not a product feature.
Winning it comes down to three things: seeing it in time, pricing it right, and holding every paper the submission asks for. Miss one and it goes to a firm that did not. We are opening the pilot to a small number of Philippine general contractors.
See it working firstWritten answers, not a chatbot that guesses. It will not quote fees or form numbers, because those change. Anything it cannot answer goes to [email protected].